Program Management
- What happens if I accidentally delete a program
- When I copy a program, what exactly is included in the copy?
- What happens when the end date has passed in a program?
- Can I change the date of an event in an active program?
- Can I lock assignments/blocks/events further on and let them be visible on a specific date?
- I have to add or make some changes in assignments during an active program - can I do that?